|
Project |
Description |
Client |
Remarks |
| Erection By Pass Stack Line II |
Erection By Pass Stack Line II |
AMCC |
|
| Erection for Raw Mill & By Pass |
Erection for Raw Mill & By Pass |
QCC |
|
| The Electro-Mechanical works for Existing Bar Mill Plant # 1 upgrading Project |
The Electro-Mechanical works for Existing Bar Mill Plant # 1 upgrading Project |
EZDK |
|
| Di calcium phosphate Unit Installation Project. |
Di calcium phosphate Unit Installation Project. |
SCFP |
|
| The Electro-Mechanical works for existing fume upgrading Project |
The Electro-Mechanical works for existing fume upgrading Project |
EZDK |
|
| Tyre No.(2) Line III replacement |
Tyre No.(2) Line III replacement |
ACCC |
|
| Pipe Lines Networks Installation. |
Pipe Lines Networks Installation. |
SEC |
|
| Slag System Installation |
Slag System Installation |
CEMEX |
|
| Change Turnunion for Ram Mill under KHD Supervision. |
Change Turnunion for Ram Mill under KHD Supervision. |
CEMEX |
|
| Bucket Elevator Replacement |
Bucket Elevator Replacement |
TPCC |
|
| Rotary Cooler Section Replacement |
Rotary Cooler Section Replacement |
TPCC |
|
| Girth Gear Replacement Line No. (1) |
Girth Gear Replacement Line No. (1) |
CEMEX |
|
| Water cooled Ducts Installation at CCM |
Water cooled Ducts Installation at CCM |
EZDK |
|
| Fabrication new cement Plant at South Valley company. |
Fabrication new cement Plant at South Valley company. |
TIG |
|
| Supply and Fabrication By Pass Stack Line II |
Supply and Fabrication By Pass Stack Line II |
AMCC |
|
| Replacement Slide gate for electrical arc Furnace ladle |
Replacement Slide gate for electrical arc Furnace ladle |
LISCO |
|
| Supply & fabrication diaphragm |
Supply & fabrication diaphragm |
AMCC |
|
| Change Gear Box cement Mill 8 (90 Ton) |
Change Gear Box cement Mill 8 (90 Ton) |
CEMEX |
|
| New Nitrogen Pipe Line 3000 mt |
New Nitrogen Pipe Line 3000 mt |
LISCO |
|
| Supply & Fabrication Water colled Ducts |
Supply & Fabrication Water colled Ducts |
EZDK |
|
| Supply & Fabrication Rectangular |
Supply & Fabrication Rectangular |
UHDE |
|
| Upgrading R.M Conditioning |
Upgrading R.M Conditioning |
CEMEX |
|
| Change Gear Box cement |
Change Gear Box cement |
CEMEX |
|
| Replacement 468 Reformer Tubes |
Replacement 468 Reformer Tubes |
LISCO |
|
| Change girth gear & Pinion under FLS Superv. |
Change girth gear & Pinion under FLS Superv. |
TPCC |
|
| Supply and fabrication steel structure,walkways and handrails |
Supply and fabrication steel structure,walkways and handrails |
PGM |
|
| ACCC YEARLY CONTRACT |
Mechanical Maintenance Contract |
ACCC |
|
| CEMEX YEARLY CONTRACT |
Mechanical Maintenance Contract |
CEMEX |
|
| EZDK YEARLY CONTRACT |
Mechanical Maintenance Contract |
EZDK |
|
| AMCC YEARLY CONTRACT |
Mechanical Maintenance Contract |
AMCC |
|
| Supply and Fabrication Lime Stone Plant |
Supply and Fabrication Lime Stone Plant |
SSC |
|
| The Electro-Mechanical works for existing Fume upgrading Project 2010 |
The Electro-Mechanical works for existing Fume upgrading Project 2010 |
EZDK |
|
| Install Alternative Fuel Feeding Line I,II,III |
Install Alternative Fuel Feeding Line I,II,III |
CEMEX |
|
| Replacement (3) bucket elevators |
Replacement (3) bucket elevators |
RJH |
|
| Aswan Fertilizer Project (Fertilizing Plant Installation). |
Aswan Fertilizer Project (Fertilizing Plant Installation). |
ASF |
|
| Abu Zabbel Fertilizer Project (Upgrading phosphoric Plant, TSP Plant,……) |
Abu Zabbel Fertilizer Project (Upgrading phosphoric Plant, TSP Plant,……) |
AZF |
|
| Preheater Tower Upgrading Line III |
Preheater Tower Upgrading Line III |
CEMEX |
|
| The Electro-Mechanical works for existing Bar Mill Plant# 1 upgrading project |
The Electro-Mechanical works for existing Bar Mill Plant # 1 upgrading project |
AMCC |
|
| HELWAN CEMENT PLANT YEARLY CONTRACT |
Mechanical Maintenance And Opration support service Contract |
HELWAN CEMENT PLANT |
|
| Supply and Fabrication of brazing chamber Nuffle |
Supply and Fabrication of brazing chamber Nuffle |
AUC |
|
| Erection new Bag Filter 700 Ton |
Erection new Bag Filter 700 Ton |
CEMEX |
|
| Demolish 2 main Filter (ESP)(110 + 107 Ton) |
Demolish 2 main Filter (ESP)(110 + 107 Ton) |
CEMEX |
|
| Demolish Russian Filters (ESP) 300 Ton |
Demolish Russian Filters (ESP) 300 Ton |
CEMEX |
|
| Beni Suef Cement Shut Down at Line I |
Beni Suef Cement Shut Down at Line I |
BSCC |
|
| Raw Mill Bucket Elevator Installation at line 1 |
Raw Mill Bucket Elevator Installation at line 1 |
CEMEX |
|
| Raw Mill Line II Installation |
Raw Mill Line II Installation |
BSCC |
|
| Kiln Shell Section Replacement 6.5 mt |
Kiln Shell Section Replacement 6.5 mt |
TPCC |
|
| Kiln Shell Section Replacement 12 mt |
Kiln Shell Section Replacement 12 mt |
TPCC |
|
| Quarry Crusher Installation with Belt conveyors. |
Quarry Crusher Installation with Belt conveyors. |
CEQ |
|
| New Bucket Elevator EAF # 3 |
New Bucket Elevator EAF # 3 |
EZDK |
|